Reformation purge

2017-02-21 View Original

Thread Content

How to purge the feed and discharge pipelines from the reactor to the heating furnace? Also, how should the pipeline from the plate heat exchanger outlet to the air cooler be purged? I would appreciate it if experts could provide some guidance
Reply #2 2017-02-21
First, it is necessary to understand the purpose of purging. Purging is used to remove debris from inside the pipe. The specific purging plan should be determined based on the layout of the pipes at your site; generally, a location is chosen as the exhaust point, and the outlet must be large enough to allow larger debris such as welding rods and wires to be removed.
Reply #3 2017-02-23
Whether it is a shutdown purging or an initial startup purging, they are both different
Reply #4 2017-02-23
Initial start-up: Check that the pipeline is clean when it is on the ground surface; Maintenance: Vacuum pumping, nitrogen purging.
Reply #5 2017-02-24
We arrived at the site late; the installation was already nearly complete

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.