Thread Content

What are the operating steps for a coke tower? Answer: 1. Preparation for the new tower: (1) Expelling air, pressure testing, preheating; (2) Preheating with gas; (3) Switching to the new tower. 2. Treatment of the old tower: (1) Light blowing; (2) Heavy blowing; (3) Cooling the coke with water; (4) Draining water. http://bbs.hcbbs.com/static/image/hrline/1.gif http://bbs.hcbbs.com/static/image/hrline/2.gif The answers will be announced automatically in two days. Petrochemical Section—“Creative Ideas for Energy Saving” campaign (the second phase is currently in progress): http://bbs.hcbbs.com/thread-1666758-1-1.html “My Technical Upgrades” in coal chemical industry in 2017: http://bbs.hcbbs.com/thread-1786290-1-1.html [Daily Question] Summary post on catalyst-based coking and reformed oil blending in 2017: http://bbs.hcbbs.com/thread-1811219-1-1.html [Q&A] Summary post on catalyst-based coking and reformed oil blending in 2017: http://bbs.hcbbs.com/thread-1826018-1-1.html
Reply #2 2017-09-02
1. Preparation of the new tower: air expulsion, pressure testing, preheating; Gas preheating ; Tower replacement 2, treatment of the old tower: light blowing ; Heavy blowing ; Feed water for cooling coke ; Let it out.
Reply #3 2017-09-02
(1) Air expulsion, pressure testing, preheating (2) Gas preheating (3) Tower replacement
Reply #4 2017-09-02
(1) Air expulsion, pressure testing, preheating (2) Gas preheating (3) Tower replacement
Reply #5 2017-09-02
Pressure testing, heating the tower, shutting down the tower, blowing steam at different pressures, filling with water, shutting down the coke burner
Reply #6 2017-09-02
1. Air expulsion 2. Pressure testing 3. Steam preheating 4. Oil and gas preheating 5. Tower replacement operation 6. Treatment of the old tower: (1) Light steam injection (2) Heavy steam injection (3) Cooling the coke with water (4) Water drainage 7. Coke removal
Reply #7 2017-09-02
(1) Air expulsion, pressure testing, preheating (2) Gas preheating (3) Tower replacement
Reply #8 2017-09-02
Preheat; Cut the four-way connector ; Small steam supply ; Large steam supply ; Small water supply ; Large water supply ; Water injection for coking removal
Reply #9 2017-09-02
(1) Air expulsion, pressure testing, preheating (2) Gas preheating (3) Tower replacement
Reply #10 2017-09-02
(1) Air expulsion, pressure testing, preheating (2) Gas preheating (3) Tower replacement

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.