HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Charring problem in ethylene cracking furnaces

2019-03-19 View Original

Thread Content

Which domestic factory doesn’t have a pyrolysis furnace and coking tank, with the coking gas being sent directly back into the furnace chamber? Are there any difficulties in operation?
Reply #2 2019-03-27
Hengli Ethylene does not have a burning tank; the material is directly burned and sent back to the furnace. As for the specific steps, we’ll have to wait until we’re driving
Reply #3 2019-03-27
Hengli Ethylene does not have a burning tank; the material is directly burned and sent back to the furnace. As for the specific steps, we’ll have to wait until we’re driving
Reply #4 2019-03-27
Hengli Ethylene does not have a burning tank; the material is directly burned and sent back to the furnace. As for the specific steps, we’ll have to wait until we’re driving
Reply #5 2019-03-27
When will the constant-force ethylene plant be able to start operating?
Reply #6 2020-06-17
This design should come with an operation manual, right? Why do we have to wait until it’s in use to get one?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.