Will the manufacturing plant conduct calculations after receiving the drawings from the design institute?

2017-01-07 View Original

Thread Content

For example, use SW6 to check the wall thickness, hole reinforcement, etc. Sometimes the design institute does not provide the calculation documents. Or when obtaining the calculation documents from the design institute, would it be checked again as well?
Reply #2 2017-01-07
Generally, the incoming drawings are reviewed, and a review record is prepared...
Reply #3 2017-01-07
The review of external drawings generally does not include an examination of strength calculations, unless there are obvious doubts regarding the drawings that prompt such an assessment. When reviewing external drawings, we focus on determining their classification, whether the classification matches the manufacturing qualifications, whether the signing on the drawings is proper, whether the design stamps are valid, whether the selected design standards and regulations comply with the requirements, and whether the design documents are complete.
Reply #4 2017-01-07
This is how we do it: once the technical staff receive the drawings from the design institute, they conduct a review of those drawings. This includes checking the strength calculations, the technical requirements specified in the drawings, the material requirements, the machining requirements, and verifying the dimensions. A record of this review is prepared, and after it is signed at two levels, communication is held with the design unit to resolve any issues before construction begins.
Reply #5 2017-01-07
It seems your company is very thorough! It’s reassuring!
Reply #6 2017-01-07
When examining the calculation reports prepared by the design institute, first check what software was used for the calculations and whether it is the latest version; second, verify whether the input data is correct. If there are no issues with the inputs, further calculations are not necessary. If there are errors in the inputs, it is sufficient to contact the design institute without conducting additional calculations.
Reply #7 2017-01-07
If it’s not taken into account, whose fault will it be if there are design issues?
Reply #8 2017-01-08
It is generally necessary to conduct checks. Although the design institute reviews the drawings, if any issues arise, the company will still be involved. Usually, after we finish drawing the diagrams, we first have them reviewed by the design institute; once they send them back to us, we conduct another review. Only after confirming that there are no problems do we proceed with finalizing the process details.
Reply #9 2017-01-08
Usually, calculations are carried out to verify whether the design strength is reasonable, but such calculations are not done in full; they are used to assess the risks that may arise during the manufacturing process. :P

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.