HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Inspection route map for steam turbine specialty

2017-02-03 View Original

Thread Content

Turbine inspection route map: Control room, hot water network deaerator, No. 3 high-pressure heater, deaerator, drain expansion tank, intermediate auxiliary header, No. 1 high-pressure heater, No. 2 high-pressure heater, Small Turbine Unit B, Small Turbine Unit A, turbine generator set, hot water network heater, low-pressure auxiliary header, No. 5 low-pressure heater, No. 6 low-pressure heater, No. 7 and No. 8 low-pressure heaters, shaft seal heater, main oil tank, top shaft oil pump, oil purification system, oil transfer pump, lubricating oil cooler, vacuum pump, condensate pump, hot water network drain pump, rubber ball cleaning device, seal oil system, internal cooling water system, open-type water filter and pump, closed-type cooler and pump, condensate water pump, steam pump pre-pump, small oil tank oil pump, electric feed water pump, EH oil system, horizontal condensate water tank and pump, condensate water storage tank, cooling tower, circulating water pump system, oil storage tank, return from South Gate to control room

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.