Design issues of return pipes in the LPG storage and distribution station construction process

2017-02-23 View Original

Thread Content

At LPG storage and distribution stations, the safety return flow on the hydrocarbon pump outlet pipeline returns to a separate inlet of the storage tank through a return pipe. The earliest specifications did not mention the need to install a safety return valve at the pump outlet. Is it feasible to have the safety return valve at the outlet lead back to the liquid inlet of the storage tank, without using a separate return pipe? Is there any specification that mentions the need to design a separate safety return pipe?
Reply #2 2024-01-04
The purpose of this setting is to prevent damage to the pipes caused by excessive pressure in the pipeline network resulting from the activation of the pump.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.