HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What does “aspen” mean here? Need help?

2017-03-07 View Original

Thread Content

The following Unit Operation blocks were completed with errors: B1 The following messages were issued during Input Translation: INFORMATION PURE COMPONENT PARAMETERS FOR SOME COMPONENTS ARE RETRIEVED FROM SDF TABLE. THESE PARAMETERS ARE USED WITH THE ELECNRTL OPTION SET UNLESS YOU ENTER YOUR OWN PARAMETERS IN PROP-DATA PARAGRAPHS PARAMETERS RETRIEVED FOR COMPONENT H2O ARE: VLBROC PLXANT PARAMETERS RETRIEVED FOR COMPONENT CO2 ARE: VLBROC PARAMETERS RETRIEVED FOR COMPONENT H3N ARE: VLBROC INFORMATION WHILE CHECKING INPUT SPECIFICATIONS BLOCK NAME: B1 MODEL NAME: RADFRAC AN INITIAL TEMPERATURE PROFILE SHOULD BE SPECIFIED IN SENTENCE 'T-EST' IF 'Q1' AND 'QN' ARE SPECIFIED. * WARNING WHILE CHECKING INPUT SPECIFICATIONS BLOCK NAME: B8 MODEL NAME: RSTOIC PHYSICAL PROPERTY PARAMETER DHFORM OR DHAQFM IS MISSING FOR THE FOLLOWING COMPONENTS: N2H8SO3 N2H8SO4 ABSENCE OF THIS PARAMETER WILL RESULT IN INCORRECT ENTHALPY RESULTS. * WARNING WHILE CHECKING INPUT SPECIFICATIONS INCONSISTENT FREE WATER SETTING DETECTED FOR 4 STREAMS

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.