HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Basic Process Knowledge (Multiple Choice) 20181111

2018-11-11View Original

Thread Content

According to the test requirements for restoring the temperature in a cold storage, the temperature rise over 6 hours after shutdown should be measured. A. It can only be carried out when the temperature difference between indoors and outdoors is 25. B. Stop the system and conduct the test after lowering the warehouse temperature from room temperature to the designated level. C. Fill the warehouse with cold goods, lower the temperature to the minimum specified level, and allow sufficient cooling before conducting the test. D. When the warehouse is empty, use method C for testing
Reply #22018-11-11
C. Fill the tank with cold goods, bring it down to the lower limit of the designed tank temperature, and allow it to cool thoroughly before taking measurements

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.