Thread Content
With a winning bid price of 42.37 million yuan, Sinopec Jianghan Petroleum Engineering Construction Co., Ltd. successfully won this major survey and design project in the southwest region! On April 26, Jianghan Design Company, which is part of the Petroleum Engineering Construction Company, successfully won the bid for the survey and design work related to the Jiangjin-Nanchuan natural gas pipeline project, with a bid price of 42.37 million yuan, demonstrating the company’s strength in the field of survey and design. It is reported that the Jiangjin-Nanchuan natural gas pipeline project is an important infrastructure project in the Sichuan-Chongqing region, and it constitutes a vital part of the livelihood-related initiatives aimed at implementing the **\"Western Development\" strategy. The gas pipeline project is approximately 140.5 kilometers in length. The designed pressure of the pipeline is 10 megapascals, with a diameter of 1,016 millimeters. Its designed gas transmission capacity is 4.8 billion cubic meters per year. Two new gas handling stations and 9 monitoring and distribution valve rooms will be constructed. This project is in line with **storage and transportation facility development policies as well as energy policies; it meets the needs arising from the reform of the operation mechanisms for oil and gas pipelines. Once completed, it will enhance the safety and reliability of Chongqing’s natural gas supply system, accelerate the development of the natural gas ’production, supply, storage, and sales’ infrastructure in the Sichuan-Chongqing region, and provide strong support for the economic development of this region as well as the Yangtze River Economic Belt. In recent years, Jianghan Design Company has continued to explore the potential of the oil and gas field market in Sichuan and Chongqing. It has undertaken various long-distance, large-diameter gas pipeline projects, including the Sichuan Gas to East China pipeline, the Nanchuan Shuijiang-Fuling Baitao gas pipeline project, and the Fuling-Wangchang gas transmission pipeline project, thereby establishing a strong reputation for oil and gas engineering construction in the Southwest region. By the end of the 13th Five-Year Plan period, the company had obtained 9 patents in the field of shale gas surface engineering technologies. It won 5 awards for high-quality projects from its group company, as well as a number of prestigious awards such as the First Prize for Excellent Consulting Projects, the First Prize for Outstanding Design, the First Prize for Scientific and Technological Progress, the Gold Award for High-Quality Projects, and a Special Award for Excellent Investment Projects. In this way, it developed a series of technical systems with independent intellectual property rights. At present, Jianghan Design Company has, in accordance with the client’s requirements, dispatched its most skilled professionals to the project site to carry out surveying and route selection work. The company is committed to turning this project into a high-quality, excellence-driven project, and to establishing itself as a first-class engineering firm in the industry, leading in China and renowned internationally. Source: Refining and Petrochemical News