May I ask whether a condenser is required for storage tanks of flammable liquids or volatile liquids?

2022-10-11View Original

Thread Content

I would like to ask whether condensers are required for storage tanks holding flammable liquids or volatile liquids in a tank farm Less than 100 m3
Reply #22022-10-11
According to Article 12.1.4, Paragraph 3 of GB 50074-2014, mobile foam fire extinguishing systems may be used for above-ground horizontal storage tanks, vertical oil tanks covered with soil, vertical storage tanks for Class B liquids, and above-ground storage tanks with a capacity of not more than 200 m3. Paragraph 2 of Article 12.1.5 stipulates that for above-ground vertical storage tanks with a capacity of less than 3000 m3 or a tank wall height of less than 15 m, as well as other storage tanks, a mobile fire cooling water system may be installed. Therefore, your 20m3 above-ground horizontal storage tank at normal pressure can be equipped with a mobile foam fire extinguishing system and a mobile fire cooling water system. If you do not want to use mobile systems, then fixed systems must be installed; it is not possible to omit them.
Reply #32022-10-12
Sorry, my question is whether a condenser is required on the storage tank
Reply #42022-10-12
What is the purpose of installing a condenser in a storage tank? :o
Reply #52022-10-12
Is there no condenser in the exhaust emission system?
Reply #62022-12-13
There is no mandatory requirement for this; it depends on your emission requirements
Reply #72022-12-15
It depends on the degree of solvent evaporation from your exhaust gases. At the installation site, I’ve seen units equipped with condensers as well as those without them – it depends on the situation
Reply #82022-12-26
Most of the API factories in Zhejiang have added it, of course on the condition that the materials stored are volatile. Generally, a heat exchanger with a capacity of 2 to 5 square meters is added, and chilled water is passed through it.
Reply #92022-12-27
Adding it can reduce the load on downstream treatment facilities. It depends on the actual situation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.