Thread Content
This post was last edited by Firefly on 2015-4-10 at 08:50. To be honest, I myself don’t even know what my strengths are. Since starting work, I have been involved in air separation process operations, on-site setup for air separation systems, pipeline installation, pipeline material selection, valve selection, pipeline support selection and installation, and even on-site construction. In short, I’ve been involved in everything related to the work done in design institutes as well as on-site activities; I touch upon various aspects, but my knowledge in each area is only superficial. I set up this office partly in response to the station manager’s call, and partly because I hope to exchange more ideas with other members here. Whether the questions you raise can be answered by me or not, I will respond to them all. If there are aspects of your question that are not suitable for public discussion, you can communicate via private message. (This post is intended for one-on-one discussions between those seeking help and those who are experts in this technology; other users are not allowed to discuss it. If you have different opinions, please create a new thread in the Air Separation Technology discussion area. Thank you for your cooperation.)
This post was last edited by hxm2087 on 2012-4-1 at 11:49. The post has been republished; the link is: http://bbs.hcbbs.com/thread-980404-1-1.html. For any related questions, please post your inquiries here.