The problems revealed by China’s coal chemical industry demonstration projects

2017-06-12 View Original

Thread Content

In accordance with the requirements of the \"13th Five-Year Plan\" Guidelines for the Development of Modern Coal Chemical Industry, project demonstration remains the main task for the coal chemical industry in the coming period. In a sense, the so-called project demonstration is actually a process of trial and error. So far, what problems that require improvement have modern coal chemical industries shown? After interviewing some industry experts and project managers, the author identified several key aspects. First, the design scheme is not optimized. As for the coal chemical projects that have been built and put into operation in China, the lack of competitiveness in many of these projects is due to issues in their design. There are many reasons for this; these include issues such as insufficient design capabilities and experience on the part of the design firms, as well as suboptimal design solutions. On the owner’s end, there is a desire to see results quickly, ignoring the standard construction timeline for chemical projects, which involves 5 years of design work, 3 years of construction, and then operation once completed. As a result, the owners press the design firms to produce drawings as soon as possible, which leads to carelessness in the design process and frequent design changes. This results in projects being built only to be demolished again, and then rebuilt over and over. The bigger problem is that due to suboptimal and inadequate design, production becomes unstable after the project is completed, with astonishing waste of energy and materials, making it difficult to control the cost of the products. Such as system configuration. Modern coal chemical industries are large in scale, and most adopt multi-series configuration schemes. Moreover, the system optimization for some projects has been inadequately considered, and the layout plans as well as the utility systems are not optimized enough. For example, the long distances within the factory area were not taken into sufficient consideration; traditional centralized setups were still used for utility systems and auxiliary systems, which resulted in insufficient supply at the end points and high points, as well as difficulties in returning the flow back. Another example is the energy consumption associated with system transportation; even if the concentration of a certain substance is low, its total amount can still be significant. If balance is not taken into account, processing facilities will be lacking during production, or considerable amounts of energy will be wasted ; Another example is the idealization of the scale of upstream and downstream equipment, which results in equipment capacity that is either too low or too high; in particular, when the capacity is too low, the equipment lacks the ability to cope with variations in raw materials and fluctuations in production load. Another example is the layout of power boilers and air separation units. To reduce heat loss and shorten the length of high-pressure steam pipelines, it is generally advisable to place the air compressors as close as possible to the boilers. Since the boilers are usually located downwind, the air separation units are also placed downwind or slightly downwind of them, which results in excessive levels of carbon dioxide and hydrocarbons in the air drawn in by these units… Modern coal chemical projects involve investments in the tens or even hundreds of billions of yuan; any major or excessive design errors can lead to incalculable losses. Second, investment is difficult to control. Coal chemical projects are capital-intensive industries. A coal-to-natural gas project with an annual production capacity of 4 billion cubic meters requires an initial investment of around 36 billion yuan; the interest payments to financial institutions alone exceed 2 billion yuan per year. If there is even a slight lapse in the construction process, a 10% overrun of the budget would amount to 3.6 billion yuan, and the annual financial interest costs would increase by more than 200 million yuan. In fact, for coal chemical projects, whether the investment costs are well controlled often becomes the key to the success or failure of the project. For example, for coal-to-olefins projects with a capacity of 600,000 tons each, some companies keep their investment at around 17 billion yuan; such projects prove successful after going into operation, and they are still able to generate profits even in an environment where product prices are currently low ; However, there are also projects whose total investment approaches 30 billion yuan, resulting in excessive financial costs; the products cannot cover these costs, and such projects incur losses as soon as they begin operation. The author came across such a case. Since its operation began, a coal-based fertilizer factory in a certain area has achieved the designed production volume, yet it continues to incur losses year after year. Recently, its parent company required it to develop a plan to turn losses into profits over the next 5 years, but despite every effort made, the company was unable to come up with a plan that would enable it to be profitable. The fundamental reason is the high investment costs incurred during project construction, which results in persistently high financial costs. Coupled with the fact that fertilizers are a product with severe overcapacity and thus cannot see rising prices, these combined factors make it difficult for companies to achieve profitability no matter how hard they try. There are many other similar coal chemical enterprises as well. People call such projects hard-loss projects. Third, the problem of \"coal at the beginning and water at the end\" remains unsolved. The so-called coal head problem refers to the fact that the gasification technology used in some coal chemical projects has not yet been fully perfected. It is understood that many coal chemical projects that have already been put into operation in our country are facing significant difficulties due to issues related to coal, and they are still working hard to find solutions. For example, in some projects, the gasification furnace does not match perfectly with the type of coal available at the project site, resulting in an unstable and incomplete gasification process. As a consequence, the output of syngas is insufficient to meet the needs of subsequent production processes, preventing the project’s capacity from being fully utilized. The two first coal-to-gas projects in our country to be built and put into operation – Keqi Coal-to-Gas and HuiNeng Coal-to-Gas – encountered issues with the lining inside the gasification furnaces during operation, as they did not fully understand the characteristics of the coal used; this led to shutdowns for maintenance. In some projects, since the gasification furnace can only handle lump coal, a large amount of fine coal generated during production cannot be utilized, which becomes a bottleneck restricting production ; In some projects, the insufficient concentration of water-coal slurry affects the production volume of syngas in the gasifier ; Another issue arises from the mismatch between the gasification furnace and the type of coal, which leads to instability in the coal feed and directly affects production volume. The so-called water tail problem refers to the wastewater treatment for a project. **When approving coal chemical projects, it is required that these projects achieve zero wastewater discharge. However, in reality, due to the large volume of wastewater generated by such projects, it is difficult to achieve true zero wastewater discharge using existing wastewater treatment technologies. All coal chemical projects required to achieve zero emissions use evaporation ponds without exception to store the wastewater generated during production as well as the wastewater that cannot be fully treated. However, the contradiction between the limited capacity of the evaporation ponds and the unlimited wastewater generated during the project’s production process is difficult to resolve. Last year, a coal chemical project experienced a dam failure in its evaporation pond due to excessive accumulation of wastewater, resulting in a serious environmental incident that forced the project to shut down for nearly a year for rectification. Fourth, poor management. These days, many companies are carrying out benchmarking activities in order to improve their corporate management. Some companies use certain technical indicators of more advanced firms, such as product energy consumption, material usage, and costs, as benchmarks. Yet they are unable to improve these technical indicators or reduce their consumption levels, without being able to identify the reasons for this. In the author’s observation, one of the key reasons is the failure to grasp the fundamental aspect of excellent corporate management mechanisms. For example, some state-owned enterprises have overly long management chains and too many management levels, which results in very low efficiency in handling tasks and high investment costs. The management levels in some large domestic coal chemical enterprises amount to 4 or 5 tiers. For any matter, from seeking approval to making a decision, from formulating a plan to carrying it out, the process is extremely lengthy; by the time a decision is made at the higher levels, it’s often too late. In a rapidly changing market, such a management style with strong elements of a planned economy has no future if it is not changed. In reality, similar projects yield vastly different outcomes due to varying management approaches. For example, a private coal chemical enterprise launched a coal chemical project identical to one carried out by a large state-owned enterprise. However, this private enterprise has only two levels of management, and as the project operates as an independent entity, its management team is highly efficient – comprising less than half the number of employees compared to similar state-owned enterprises – resulting in a relatively streamlined decision-making process. The spare parts required for the production process of this private enterprise can be purchased whenever needed, and the inventory value is less than 3 million yuan. And similar state-owned enterprises have inventory amounts of hundreds of millions of yuan alone. This private coal chemical enterprise not only has investment costs that are **lower than those of state-owned enterprises, but its operating costs are also the best among similar companies; as a result, it has become one of the benchmark companies for reference by other firms in the same industry, especially state-owned ones. The management model determines the effectiveness of a company’s efforts to save energy and reduce consumption. A coal-to-olefins plant with an annual production capacity of 600,000 tons requires nearly 20 million tons of raw coal and fuel coal per year; depending on whether these resources are used efficiently or wasted, savings or losses of hundreds of millions of yuan can result. Coal chemical enterprises generate large amounts of by-products during the production process; if utilized properly through quality improvement and conversion, these by-products can bring considerable benefits. Although international oil prices are currently low and the prices of coal-based chemical products are cheap, under the same market conditions, some coal-to-olefins companies are still able to turn a profit. A careful analysis of the factors that enable these profitable coal chemical enterprises to succeed shows that they have done an excellent job across the entire value chain – for example, by integrating coal, electricity, and chemical production to create a comprehensive value chain, and by utilizing by-products and waste in a circular economy approach, thereby gaining a cost advantage. Trial and error in demonstration projects is not the goal; exposing the problems of such projects is also not the goal. What matters is making corrections and avoiding such issues – the aim is to prevent these problems from being replicated and carried over to subsequent coal chemical projects.
Reply #2 2017-06-12
The question is sharp and worth our careful consideration
Reply #3 2017-06-13
The analysis is thorough; it’s worth learning from*
Reply #4 2017-06-19
The analysis is thorough, but it’s very difficult to solve
Reply #5 2017-06-19
State-owned investment entities lack a sense of ownership, resulting in severe waste of investments.
Reply #6 2017-06-20
A coal-to-olefins plant with an annual production capacity of 600,000 tons requires nearly 20 million tons of raw coal and fuel coal per year. Is this coal consumption normal?
Reply #7 2017-06-21
It can’t be said that either; investments are being made very cautiously these days. The problems arose during the boom in coal chemical industry in previous years.
Reply #8 2017-06-21
The main issue is the high consumption of fuel coal. 600,000 tons of coal-based olefins, which is roughly equivalent to 1.8 million tons of methanol. The amount of coal used as raw material is at most 3 million tons; the rest must be coal used as fuel for boilers
Reply #9 2017-06-22
It is a plant where the process control for converting coal gas into methanol is relatively poor; electricity is generated on-site. The coal consumption per ton of methanol produced is approximately 2.5 tons, based on long-term data collected by the plant. 1.8 million tons of methanol – if I calculate it based on 3 segments of coal consumption, it amounts to only 5.4 million tons of coal. During the MTO phase, an additional 1.6 million tons of coal will be added. Up to 7 million tons – that’s already an exorbitant price. Where did the 20 million tons of raw coal go? Has the boiler been connected to the power plant’s grid?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.