This post was last edited by lflsedin on 2015-7-4 at 21:43. It is a voluntary information disclosure announcement regarding the commissioning of the project at its subsidiary, Xinjiang Yihua Chemical Co., Ltd., which involves an annual production capacity of 400,000 tons of synthetic ammonia and 600,000 tons of urea. The company and all members of its board of directors guarantee that the information disclosed is true, accurate, and complete, with no false records, misleading statements, or significant omissions. The project of Xinjiang Yihua Chemical Co., Ltd., a subsidiary of the company, to produce 400,000 tons of synthetic ammonia and 600,000 tons of urea per year, which was approved at the company’s 5th meeting of the 6th board of directors in 2010 as well as at the 2nd extraordinary general meeting of shareholders in 2010, has recently come online and is now producing qualified products. This is to announce. Board of Directors of Hubei Yihua Chemical Co., Ltd. December 30, 2011. It is understood that the project employs clean production processes; the relevant technology involves using lignite gas emissions as raw material for the production of 200,000 tons of synthetic ammonia, which is then mixed with semi-water gas produced through gas generation after undergoing thorough purification ; Urea production using a Lurgi furnace for gas generation, full-low-temperature shift reaction, pressure swing adsorption for carbon removal, alcohol-hydrocarbon synthesis for syngas purification, and an improved aqueous solution full-circulation process
Making money in Xinjiang – a nightmare for the locals!
Does Hubei Yihua have a larger project in Wucaiwan?
Reply to 1# whyingde: “Why use a Lurgi furnace for gas production and full-low-temperature shift?” ! That can’t be right! I’ve never heard of the Lurgi furnace used in that project.
Reply to 4# lflsedin: Quoting information from the internet – Detailed introduction to the Xinjiang Low-Carbon Circular Economy Industrial Park project: 1. Synthetic ammonia and urea production: The project involves building facilities with an annual synthetic ammonia production capacity of 400,000 tons and a urea production capacity of 600,000 tons, as well as a 300MW captive power plant. The project employs clean production processes; the relevant technology involves using lignite coke exhaust as raw material for 200,000 tons of synthetic ammonia, which is then thoroughly purified and mixed with semi-water gas produced through gas generation ; Gas production is carried out using a Ruchi furnace, full-low-temperature shift reaction, pressure swing adsorption for carbon removal, alcohol-hydrocarbon synthesis for syngas purification, and an improved aqueous solution full-circulation method for urea production; DCS computer-based process control is employed to achieve energy savings and emission reduction. Main equipment: Luchi gas generator, 4M40 low-pressure hydrogen and nitrogen compressor, 4M50 high-pressure hydrogen and nitrogen compressor, mixed waste combustion furnace, Ф2000 ammonia synthesis tower, and auxiliary utilities for the 66m3 urea tower. The project covers an area of 1,200 mu, consuming 1.6 million tons of local coal annually, 800 million kWh of electricity, and 5.1 million tons of water. Total investment amount: The total investment in this project is 3.5 billion yuan. Benefit estimation: Upon completion of the project, it will generate annual sales revenue of 2.8 billion yuan, with profits and taxes amounting to 700 million yuan.