Thread Content
On December 25, 2016, Daqing He Gong New Energy Technology Co., Ltd. (hereinafter referred to as “Daqing He Gong”) signed a contract for the licensing of the technical specifications related to a 400,000 tons per year ethylene glycol production facility with Shanghai Pu Jing Chemical Technology Co., Ltd. Daqing He Gong is affiliated with Shenwu Group. It relies on the Linyuan coal utilization projects with capacities of 6 million tons and 9 million tons per year, along with the supporting facilities; the total investment amounts to 15.2 billion yuan, with construction taking place in two phases. The total investment for Phase 1 of the project is 7.2 billion yuan, intended for the construction of a coal cleaning and utilization facility with an annual processing capacity of 6 million tons, along with related facilities. The main constructions include 3*1000,000-ton brown coal rapid pyrolysis units, a 700,000-ton ethylene glycol plant, a 300,000-ton coal tar treatment plant, 3*50MW back-pressure steam turbine generator sets for on-site power generation, as well as related auxiliary facilities. The 400,000 tons per year ethylene glycol plant utilizes Shanghai Pujing Chemical’s patented technology for producing ethylene glycol from syngas, and it was constructed under EPC contract by Beijing Huafu Engineering Co., Ltd.; the location of the plant is in the Linyuan Industrial Park of the High-Tech Zone in Daqing City, Heilongjiang Province.
What stage has this project reached currently?
Is there an ethylene glycol process flow? Study*Study*