Thread Content
This post was last edited by liaifeng on 2018-9-6 at 19:15. Environmental impact assessment approved for downstream utilization project of by-products generated in JiuTai Energy’s MTO facility. Author/Source: Date: 2017-04-10. Views: 11. On April 7, 2017, the Ordos Environmental Protection Bureau intended to issue its approval decision regarding the environmental impact assessment document for JiuTai Energy (Jungar) Co., Ltd.’s project aimed at producing 80,000 tons of styrene-butadiene rubber per year. To ensure the seriousness and fairness of this review process, the basic information regarding the environmental impact assessment documents for which approval is to be granted is being made public. The period of public disclosure begins on April 7, 2017, and lasts for (5 working days). Project Overview: The 80,000-ton per year styrene-butadiene rubber production project of Jutai Energy (Jungar) Co., Ltd. is located in the Southern Industrial Zone of Dalu Industrial Park, Jungar Banner, Ordos City. There is open land to the east and south of the project; to the west lies the wastewater treatment facility for Jutai’s methanol deep processing project (under construction), while to the north is Jutai’s methanol deep processing project (also under construction). The total investment for the project is 812,454,700 yuan, of which 3,700 yuan is allocated to environmental protection measures, accounting for 4.55% of the total investment. The construction scale of this project is an annual production capacity of 80,000 tons of styrene-butadiene rubber. The polymerization unit, coagulation unit, and post-treatment unit are arranged in two production lines, with each line having a capacity of 40,000 tons per year. The construction scope of this project includes the installation of catalysts, as well as the polymerization unit, coagulation unit, post-treatment unit, and solvent recovery unit. The utility systems and production auxiliary facilities mainly include a refrigeration station, finished product storage areas, cabinet rooms, and power distribution rooms. Construction location: Dali Industrial Park, Zhungeer Banner. Constructor: Jutai Energy (Zhungeer) Co., Ltd. The methanol deep-processing project carried out by Jutai Energy covers an area of 1,045 mu, with a total estimated investment of 8.2 billion yuan; 3.2 billion yuan has already been invested, and the project is scheduled to be completed and put into operation in June 2018. The design capacity is 600,000 tons per year of olefins (250,000 tons of polyethylene and 350,000 tons of polypropylene), 60,000 tons of butadiene, 125,000 tons of butylene, and 60,000 tons of oils and liquefied petroleum gas. The 80,000-ton styrene-butadiene rubber project will use butadiene produced as a by-product of the methanol deep-processing project as its raw material, and is expected to be completed and put into operation in 2018.
Jiutai, keep it up, haha; it’s been a long time since this project started