HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Q&A Question 103】April 13, 2017

2017-04-13 View Original

Thread Content

【Q&A Question 103】April 13, 2017: What are the steps for an emergency shutdown of the new hydrogen compressor? The reference answer will be shown after responding; points will be awarded for identifying the key points. (Unless otherwise specified, all questions and answers are based on hydrogenation units.) ) 1. Immediately cut off the power supply (press the stop button); if possible, reduce the load to 0% first ; 2. Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; 3. For other cases, follow the normal shutdown procedures. Scoring criteria: Incorrect answers result in 2 Wealth points; *incomplete* answers earn 3–8 points. Correct answers with a detailed explanation grant 10 Wealth points, while correct answers with insufficient supplementary *answers* yield 15–20 Wealth points. Please use these criteria for scoring. 2017 Q&A Summary Thread (updates starting now) http://bbs.hcbbs.com/thread-1657793-1-1.html 2017 Daily Question Summary Thread (updates starting now) http://bbs.hcbbs.com/thread-1657794-1-1.html 2016 Q&A Summary Thread (updates completed) http://bbs.hcbbs.com/thread-1597792-1-1.html Petrochemical Sector – “Creative Ideas for Energy Saving” campaign (sponsors sought; highest returns ever) http://bbs.hcbbs.com/thread-1666758-1-1.html Sponsors are being sought for this campaign; those interested may contact the event organizer. (Sponsors of the event are entitled to the policy allowing them to include promotional ads as sponsors in various events held in the petrochemical region for one year.) The Petrochemical Advanced Processing Edition – the event to share pictures of chemical processing equipment has begun! A vast amount of wealth, along with HChuan coins, is waiting for you to claim it: http://bbs.hcbbs.com/thread-1760733-1-1.html. Notice regarding the collection of chemical engineering technical materials in the “Petroleum and Chemicals Section”: http://bbs.hcbbs.com/thread-1614796-1-1.html (Source: HChuan Chemical Forum)
Reply #2 2017-04-13
Close the inlet and outlet valves, set it to zero load, and stop the main motor
Reply #3 2017-04-13
①Immediately cut off the power supply (press the stop button); if possible, reduce the load to 0% first; ②Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; ③For the rest, follow the normal shutdown procedures.
Reply #4 2017-04-13
1. Immediately cut off the power supply (press the machine stop button); if possible, reduce the load to 0% first; 2. Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; 3. For other cases, follow the normal shutdown procedures.
Reply #5 2017-04-13
1. Immediately cut off the power supply (press the machine stop button); if possible, reduce the load to 0% first. 2. Close the main inlet and outlet valves, and open the pressure relief valve to release pressure. 3. Follow the normal shutdown procedures for the rest.
Reply #6 2017-04-13
①Immediately cut off the power supply (press the stop button); if possible, reduce the load to 0% first; ②Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; ③For the rest, follow the normal shutdown procedures.
Reply #7 2017-04-13
①Immediately cut off the power supply (press the stop button); if possible, reduce the load to 0% first; ②Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; ③For the rest, follow the normal shutdown procedures.
Reply #8 2017-04-13
①Immediately cut off the power supply (press the stop button); if possible, reduce the load to 0% first; ②Close the main inlet and outlet valves, and open the pressure relief valve to release pressure ; ③For the rest, follow the normal shutdown procedures.
Reply #9 2017-04-13
①Immediately cut off the power supply (press the machine stop button); if possible, reduce the load to 0% first. ② Close the main inlet and outlet valves, and open the pressure relief valve to release pressure. ③ Follow the normal shutdown procedures for the rest.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.