HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Approval process for constructing a new 3,000-cubic-meter crude oil storage tank within the factory

2017-05-20 View Original

Thread Content

What are the procedures for applying for and obtaining approval to build a 3,000-cubic-meter crude oil storage tank on the reserved land within the factory? Thank you.
Reply #2 2017-05-20
It’s nothing more than the security departments, environmental protection departments, and fire departments
Reply #3 2017-05-21
Planning departments, land administration departments, security departments, environmental protection departments, fire departments.
Reply #4 2017-05-21
Thank you, so it needs to be listed as a separate item?
Reply #5 2017-05-30
Implement according to a new project, starting with the submission of plans
Reply #6 2017-05-31
Approximate steps: Step 1: Find a qualified design institute to discuss and finalize the preliminary design plan; Since it is being built within an existing factory, there should be no issues with the land certificate. Nevertheless, it’s still a good idea to consult the **planning department** to find out if any procedures related to land use approval are required. Step 2: Consult the local **planning and construction management department to prepare for the approval procedures for the construction project design. Step 3: Go back to the **planning and construction management department to obtain the construction project planning permit. Step 4: Approach the **fire safety management department to get the fire safety approval for the construction project design. Step 5: Contact the **environmental protection department to handle the environmental impact assessment procedures for the construction project. Step 6: Turn to the relevant department to complete the energy use assessment procedures for the construction project. Step 7: Visit the **construction management and bidding department to handle the bidding procedures for the construction project; oil tanks generally do not require any energy-saving-related procedures. Step 8: Approach the **construction management safety supervision department to complete the safety supervision registration procedures for the construction project. Step 9: Contact the **construction management quality supervision department to carry out the quality supervision procedures for the construction project. Step 10: Go to the **construction management department to obtain the construction permit. Each of these steps involves the preparation of several or even dozens of documents or the handling of various tasks. Be prepared for the fact that, under favorable circumstances, the process will take 2 months, but in slower cases it can take over half a year. In short, you need to personally consult the local authorities for each step
Reply #7 2017-05-31
It should belong to the second phase or phase n of the expansion project. For new projects, things start with the approval of the project, followed by planning, environmental protection considerations, safety measures, fire protection protocols, and lightning protection measures; finally, an construction permit is obtained from the relevant construction authority

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.