Precautions for starting up and shutting down negative pressure distillation towers

2017-01-09 View Original

Thread Content

When starting up a negative-pressure distillation tower, should one create a negative pressure first and then increase the temperature, or should the temperature be increased first to establish circulation before creating a negative pressure? The same question applies when shutting down the tower. Why is this? Thank you
Reply #2 2017-01-11
{:3_54:} Start first and then stop; definitely, negative pressure should be applied first. Wait until the temperature rises before introducing negative pressure, otherwise flash evaporation will occur and the entire system will be filled with messy materials. . . In severe cases, it can even damage the filler inside your tower
Reply #3 2017-02-16
First apply negative pressure and then raise the temperature to remove inert gas; when shutting down, first stop applying negative pressure and then lower the temperature (the pressure will definitely drop during this process, so inert gas needs to be added)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.