Can the 53A, 53B schemes and the 62 scheme be used together for pumps? How can the pipelines of Plan 62 be connected together?
Reply #2 2017-03-09
It is possible to add it, but I don’t understand why scheme 62 needs to be added
Reply #3 2017-03-10
It’s possible; the pipeline for Plan 62 needs to be connected to the outside of the seal. This approach does not allow for the pressurized recovery of quench water
Reply #4 2017-03-11
62 is acceptable; in low-temperature conditions, scheme 62 is used, with nitrogen being introduced to serve as a heating element and to prevent freezing on the back side of the auxiliary seal.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.