What is the purpose of the ball-passing test required for the heating coil in a U-tube heat exchanger?
Reply #2 2015-10-05
For U-tube heat exchangers, the ball-passing test required for the heating coil is intended to check whether the roundness of the tubes exceeds the specified limits.
Reply #3 2015-10-05
The purpose of conducting a roundness test is to check whether there are any areas in the pipe where it becomes too flattened during bending (in other words, whether there are excessive changes in roundness), in order to prevent blockages.
Reply #4 2015-10-05
The ball test is conducted to evaluate a pipeline’s resistance to blockage
Reply #5 2017-06-30
What if it doesn’t pass? How should we handle that?
Reply #6 2017-06-30
First, check the roundness; second, check the smoothness of the back side of the weld at the joints. If it does not meet the standards, it must be incised for treatment.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.