HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Does a bimetallic composite pipe made of carbon steel and austenitic stainless steel need to undergo heat treatment before leaving the factory?

2017-01-09View Original

Thread Content

Does a bimetallic composite pipe made of carbon steel and austenitic stainless steel need to undergo heat treatment before leaving the factory? Should solute heat treatment be carried out according to the methods for austenitic stainless steel, or normalizing heat treatment according to the methods for carbon steel? Or do something else?
Reply #22017-01-09
Is this the standard? Or some technical specification?
Reply #32017-01-10
GB 28883-2012
Reply #42017-01-10
It’s for heat treatment, right? Refer to the answer above; I’ve also learned * it
Reply #52017-01-10
:handshake You’re welcome
Reply #62019-10-08
Will heat treatment cause issues such as the need for acid washing or straightening of the stainless steel afterward? What about stress release? Will the adhesion between the two metals remain as good as before treatment, even after heat treatment or straightening?  

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.