Discussion on the supervision and inspection of submerged arc welded pipes

2020-05-15View Original

Thread Content

For submerged arc welded pipes used in long-distance pipelines, the manufacturing enterprise must undergo supervision and inspection by the local special equipment supervision department, which shall issue a supervision and inspection report. If the manufacturing enterprise does not carry out such supervision and inspection, can physical verification be used as a substitute for it? How exactly is it done?
Reply #22020-05-17
It’s unlikely. Supervisory inspections start from the stage of raw materials, and all personnel involved in the quality control system are required to conduct reviews. If one could be approved just by examining the physical product, then it would indicate a poor level of quality control: L
Reply #32020-05-29
There should be a supervision and inspection certificate! It probably won’t work if it’s not there! !
Reply #42020-06-15
It wasn’t compliant from the start, which means there will be a ton of work to do later on!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.