Thread Content
On the morning of the 2nd of the month, inside the “China’s Largest Span” factory facility of Dongfang Electric Corporation, part of the Dongfang Electric Group (referred to as “Dongfang Electric”), a giant ball valve with a diameter of nearly 4 meters and a weight of 122 tons was dispatched from the starting point marked as “0 kilometers” on the highway. It will travel over 3,300 kilometers and is expected to arrive at the pumped storage project site in Lushan, Henan, in a little over 20 days. This heavy equipment will pass through Chengdu and Meishan in sequence, before the loading process onto the ship is carried out at the Leshan Heavy Machinery Terminal ; It then proceeds along the Min River to reach the main Yangtze River channel, passing through Chongqing and crossing the Three Gorges Dam; unloading and transfer take place in Wuhan, after which it is transported by land directly to the project site. The Henan Lushan Pumped Storage Project is located in Lushan County, Pingdingshan City, Henan Province, and is a key energy infrastructure project in the province. The total installed capacity of the project is 1,300 megawatts, with a designed annual power generation output of 2.008 billion kWh. It is equipped with 4 pump-storage units, each with a capacity of 325 megawatts. All the units and associated equipment were developed and supplied by Dongfang Electric. Once operational, this power plant will primarily undertake key tasks such as peak shaving, valley filling, frequency regulation, phase regulation, and providing backup during emergency situations for the Henan power grid. It will enable the savings of 405,000 tons of standard coal per year, as well as a reduction in carbon dioxide emissions by 1.025 million tons ; At the same time, the project will integrate with the surrounding tourism resources to develop a comprehensive energy project that combines energy production with ecological tourism.
【Ten Years of Rapid Development in Chemical Engineering Equipment】New breakthroughs achieved in China’s low-temperature carbonization technology for coal from 2016 to 2025 https://bbs.hcbbs.com/thread-5700695-1-1.html (Source: Haichuan Chemical Industry Forum)
This thing must be electrically driven, right? If it had to be operated manually, that’s unimaginable:D
【Ten Years of Rapid Development in Chemical Engineering Equipment】2652-2025: Major breakthroughs achieved in the application of methanol new energy pipeline transportation technology in complex terrains in China https://bbs.hcbbs.com/thread-5700596-1-1.html (Source: Haichuan Chemical Industry Forum)
This product doesn’t require high sealing performance, right?
【Ten Years of Rapid Development in Chemical Equipment】Self-developed from 2657 to 2025! CNPC’s 100-kilowatt-class large-temperature-difference transcritical carbon dioxide air-source heat pump units put into operation https://bbs.hcbbs.com/thread-5700807-1-1.html (Source: Haichuan Chemical Industry Forum)