HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Questions regarding the installation of pipe racks

2011-12-31View Original

Thread Content

In pipeline stress calculations, such support reports are often encountered: Pipe rack: RESTRAINT, TPPE=GUIDE, GAP=3.0mm; I would like to ask how everyone handles such pipe racks? Thank you!
Reply #22011-12-31
Guiding bracket; GAP refers to the gap between the baffle and the pipe support
Reply #32012-01-01
Reply 2# wl0302: If GAP=3.0mm, does that mean it limits the lateral displacement?
Reply #42012-01-02
For the guide frame, it refers to the guiding spacing; whereas the limit value included in the calculations represents the limiting spacing

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.