2017-02-13View Original

Thread Content

The 18 high-quality projects of 2016 are as follows: 1: Jiujiang Petrochemical’s project for upgrading the quality of petroleum products; 2: The Yuanba gas field project of Southwest Petroleum Bureau, involving a purification plant with an annual production capacity of 1.7 billion cubic meters; 3: Shijiazhuang Refining & Chemicals Branch’s project for upgrading the quality of petroleum products and addressing issues related to the poor quality of crude oil; 4: The CB4E integrated production and maintenance platform of Shengli Oilfield Branch; 5: Wuhan Petrochemical’s 80,000-ton-per-year sulfur recovery facility; 6: Anqing Petrochemical’s integrated refining project, including pipelines for transporting refined oil products with an annual capacity of 8 million tons; 7: The northern area capacity expansion project of the Jiaoshi Ba block in the Fuling shale gas field; 8: Sinopec Great Wall Energy Chemicals (Ningxia) Co., Ltd.’s project for achieving zero discharge of high-salinity water; 9: The gas transmission pipeline project for Shandong’s liquefied natural gas (LNG) project; 10: The second phase of Jiangxi’s refined oil product pipelines, along with associated oil storage facilities in Yingtan, Ji’an, and Ganzhou; 11: Qilu Branch’s project to address safety hazards in its first sulfur recovery facility through technical upgrades; 12: Beihai Refinery’s project for upgrading the quality of products in its petrochemical operations (200,000 tons per year of polypropylene); 13: Maoming Branch’s No. 2 S-Zorb unit, with an annual capacity of 1.5 million tons for catalytic gasoline adsorption desulfurization; 14: Qilu Branch’s project to address safety hazards in its first catalytic cracking unit, along with energy-saving upgrades, including a catalytic cracking unit with an annual capacity of 2.6 million tons, a gas separation unit with an annual capacity of 500,000 tons, and a double desulfurization unit with an annual capacity of 510,000 tons; 15: The capacity expansion project for Ordovician oil reservoirs in the Yuejin block of Northwest Oilfield Branch; 16: Yangzi Petrochemical’s project for upgrading wastewater treatment and reuse systems as part of its third-phase renovation; 17: The natural gas dehydration and dehydrocarbonation project at the Daniuodi gas field; 18: The surface engineering projects for the development of shale gas wells in the Fuling area.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.