HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Processing procedure for main air interruption

2017-07-08View Original

Thread Content

During normal production, when the main air supply is interrupted and then restored, how are the regenerator pressure and the air reintroduction process controlled to prevent catalyst loss?
Reply #22017-07-09
What is the size of your catalytic unit? Based on our experience, we keep the pressure in the regenerator at around 100 Kpa; after introducing the main air flow and ensuring normal fluidization in the regenerator, we increase the pressure when it’s time to change the catalyst
Reply #32017-07-09
What I mean is, during the wind merging process, should the pressure be increased quickly or slowly? How fast can the main air volume be increased?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.