HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Catalytic Coking Reformate Blending Version 20190509

2019-05-09View Original

Thread Content

Participation: Prize 1 Wealth; Correct answer: 3 Wealth as a reward. https://bbs.hcbbs.com/static/image/hrline/2.gif https://bbs.hcbbs.com/static/image/hrline/3.gif Multiple-choice question: When the top circulation pump becomes evacuated, what should be done? A. Slightly increase the top temperature of the tower. B. Slightly decrease the temperature in the middle section. C. First activate the cooling reflux system, then switch to the backup pump. D. Switch to the backup pump promptly. Answer: C https://bbs.hcbbs.com/static/image/hrline/1.gif https://bbs.hcbbs.com/static/image/hrline/2.gif Note: The answer will be announced automatically after two days.
Reply #22019-05-09
C. First, run the cold reflux flow; then switch to the backup pump
Reply #32019-05-09
C. First, run the cold reflux flow; then switch to the backup pump

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.