HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Catalytic Coking Reformate Blending Version 20190616

2019-06-16View Original

Thread Content

This post was last edited by wlf1234 on 2019-6-16 06:48. Participants: Prize 1 Wealth; Correct answer: 3 Wealth as a reward. https://bbs.hcbbs.com/static/image/hrline/2.gif https://bbs.hcbbs.com/static/image/hrline/3.gif Multiple-choice question: Among the following options, which one is the correct method for dealing with pump leaks? ( ) A. Switch the pump immediately. B. If the leakage is within acceptable limits, continue to use it under observation. C. The water pump can be continued to be used if it leaks. D. Even if the heavy oil pump’s leakage is within acceptable limits, the pump must still be switched out. Answer: B https://bbs.hcbbs.com/static/image/hrline/1.gif https://bbs.hcbbs.com/static/image/hrline/2.gif Note: The answer will be announced automatically after two days.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.