HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

During the anti-freezing period, during inspections ensure that the outlet valves on the local glass panels of all containers are closed to drain all the material

2019-07-10View Original

Thread Content

During the anti-freezing period, during inspections ensure that the outlet valves on the local glass panels of all containers are closed to drain all the material
Reply #22019-07-10
If it is in operation, the valve on the instrument cannot be closed, unless it is broken.
Reply #32019-07-11
Typo! The instruments in use must be protected from freezing and condensation, and cannot be removed.
Reply #42019-12-20
With heat tracing, there’s no need to close the valve!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.