HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question No. 252】September 9, 2019

2019-09-10View Original

Thread Content

This post was last edited by Green Lotus on 2019-9-10 at 22:50. [Daily Question No. 252] As of September 9, 2019, pressure vessels classified as Grade 3 are generally inspected every 3–6 years. True or False ( ) Please reply within two days.
Reply #22019-09-10
The safety status level is 1-2, usually conducted every 6 years. The safety status level is 3, with inspections generally conducted every 3–6 years. The safety status is rated at level 4, and its inspection cycle is determined by the inspection agency. Pressure vessels with a safety status rating of 4 may not have a cumulative monitoring usage time exceeding 3 years. During monitoring, defects should be addressed to improve its security level. New pressure vessels are generally subject to their first comprehensive inspection after 3 years of operation, and the interval for the next comprehensive inspection is determined by the inspection agency based on the results of that inspection.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.