【Daily Question No. 262】September 20, 2019: When working on the tower, after purging was completed successfully, the manholes were opened one by one from top to bottom; work could proceed only after analysis confirmed that all conditions were met. True or False ( ) Please reply within two days.
Reply #22019-09-23
Correct: Whenever fire is used on equipment, containers, and pipelines used for the production, storage, or transportation of flammable materials, it is necessary to first cut off the source of those materials and install blind flanges; After thorough purging, cleaning, and displacement, open the manhole for ventilation ; When opening manholes, they should be opened one by one from top to bottom; only after a satisfactory analysis is conducted can heating be used. If heating is to continue after a break of more than 30 minutes, another analysis must be carried out, or the pipelines and containers must be filled with water before heating can be used

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.