Questions regarding main steam accident steam and sleeve accident steam

2019-10-14View Original

Thread Content

When the main steam supply is cut off, two accident steam interlocks are activated. I would like to ask those of you working with catalytic systems: does your plant immediately switch to another medium, or does it continue to use steam?
Reply #22019-10-16
Continuing to use steam, waiting to resume operations
Reply #32019-10-16
Depending on the duration, use short-term steam application, but control the amount to prevent low regeneration temperatures; avoid leaving the bed under pressure for long periods
Reply #42019-10-16
The reason for using steam is that this area typically uses steam at 1.0 Mpa, and the sufficient pressure is available to push aside the accumulated catalyst. However, it is recommended that, provided fluidization is ensured, air be used as the fluidizing medium as early as possible – it is better to start supplying air at an early stage, which is beneficial for both the catalyst and the equipment!
Reply #52019-10-21
This SeaUser answered what does it mean to make a mistake

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.