What are the supporting facilities for a 3-million-ton refinery?
Reply #22019-12-03
Atmospheric and vacuum distillation, catalysis, hydrogenation, reforming, delayed coking, wastewater stripping, sulfur recovery, PSA hydrogen production
Reply #32019-12-03
Increase gas volume and desulfurization. The scale of the restructuring is too small. According to the \"Catalogue for Industrial Structure Adjustment\" (2019 edition), the construction of new units with a capacity of 10 million tons per year or less for atmospheric and vacuum distillation, 1.5 million tons per year or less for catalytic cracking, 1 million tons per year or less for continuous reforming, and 1.5 million tons per year or less for hydrocracking falls under the category of projects that are subject to restrictions; it is therefore difficult to obtain approval for oil refining projects with a capacity of 3 million tons per year.
Reply #42019-12-03
A 3 million tons per year refining project can also be built in the surrounding areas **(such as Southeast Asia).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.