Thread Content
Ultimate goal: 40 million tons of oil refining + 7 million tons of aromatics + 6 million tons of ethylene. This post is reposted from “Fish in the Desert”: [Haichuan Chemical News] The Shenghong integrated refining project is expected to be put into operation by the end of 2021. https://bbs.hcbbs.com/thread-2952586-1-1.html @Fish in the Desert
The planning period is from 2020 to 2030, and it will be implemented in two phases. Phase I: 2020–2025; Phase II: 2026–2030. Phase 1: By 2025, the refining capacity of the Lianyungang petrochemical industry base is to reach 16 million tons per year, the ethylene production capacity is to reach 2.8 million tons per year, and the aromatic hydrocarbons production capacity is to reach 2.8 million tons per year ; Phase 2: By 2030, the refining capacity is expected to reach 40 million tons, the ethylene production capacity to reach 6 million tons, and the aromatic hydrocarbons production capacity to reach 7 million tons.
Based on the industrial planning of the base and the flow of the industrial chain, the industrial area is divided into six sections: the Shenghong Refining and Chemical Project Area, the Phase II Refining and Chemical Project Area, the Diversified Raw Material Processing Area, the Polyester Raw Material Area, the Sinochem Lianyungang Circular Economy Industrial Park, and the Chemical New Materials and Fine Chemicals Area. Shenghong Petrochemical Project Area: Primarily refers to the ongoing integrated petrochemical project of Shenghong Petrochemical (Lianyungang) Co., Ltd. This includes: 16 million tons per year of oil refining capacity, 2.8 million tons per year of p-xylene production, 1.1 million tons per year of ethylene and its downstream derivatives; a crude oil terminal with a capacity of 300,000 tons; and 4 liquid chemical terminals with a capacity of 50,000 tons each. Phase II refining and chemical project area: This area is designated for the Phase II integrated refining and chemical project; depending on the progress of projects in this base, it can be adjusted to accommodate other types of industrial projects if necessary. Diversified raw material processing area: including the existing alcohol-based cogeneration project, the propane dehydrogenation and light hydrocarbon cracking projects under construction or planned, as well as the surrounding areas. Polyester raw material area: mainly refers to the 1.5 million tons per year PTA plant currently in operation at Honggang Petrochemical, as well as the expansion project for a PTA plant with a capacity of 2.4 million tons per year. Sinochem Lianyungang Circular Economy Industrial Park: Comprised of investment projects planned or under construction by enterprises affiliated with Sinochem Group. Chemical New Materials and Fine Chemicals Zone: Utilizing various organic raw materials provided by integrated oil refining and diversified raw material processing projects, this zone develops chemical new materials and fine chemicals for downstream applications.
The ethylene production capacity reaches 6 million tons, while that of aromatics reaches 7 million tons
Just plan it out, but don’t take it too seriously; sometimes it’s just nonsense.
Overall Plan for Shandong Yulong Petrochemical Industrial Park (including requirements for managers and engineers) https://bbs.hcbbs.com/thread-2955768-1-1.html Overall Development Plan for Caofeidian Petrochemical Industrial Base https://bbs.hcbbs.com/thread-2957628-1-1.html Overall Development Plan for Fujian Meizhou Bay Petrochemical Base (2020–2030) https://bbs.hcbbs.com/thread-3065584-1-1.html