HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Delayed coking petroleum coke

2020-08-15View Original

Thread Content

What is the basis for determining whether delayed coking petroleum coke can be shipped out (high-sulfur petroleum coke)?
Reply #22020-08-15
Are there no product specifications from the factory?
Reply #32020-08-15
The treatment of petroleum coke is indeed a problem that plagues many refineries.
Reply #42020-08-15
I’m not entirely sure, but I’ve heard people say that nowadays, delayed coking petroleum coke often has excessive levels of heavy metals in it, as the feedstock contains a high amount of catalyst slurry with powdered catalysts; as a result, it’s difficult to sell such petroleum coke.
Reply #52020-08-15
Can high-sulfur petroleum coke not be shipped out of the factory at all? If it needs to be shipped, it must meet certain specifications. (This indicator is whether it is under the control of the local authorities or who else has control over it)
Reply #62020-08-15
According to your environmental impact assessment approval, the total emissions are subject to quota controls.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.