HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Is the delayed coking feed distributor still in use: Sulzer distributor

2024-06-27View Original

Thread Content

Mine has a Sulzer distributor; during the maintenance in the second cycle after operation, the air outlet passage was destructively enlarged.
Reply #22024-06-27
If the Sulzer distributor suffers destructive expansion of the air outlet channels during maintenance, it may not be able to function properly; it is recommended to contact repair services or replace it with a new distributor. .
Reply #32024-06-27
It’s because the coke blocks the passages, causing destructive expansion
Reply #42024-06-27
The expansion of the channels caused by coke blockages can impair the performance and efficiency of the distributor. It is recommended to clear the blockage and check whether there is further damage to the passage. If the damage is severe, it may be necessary to replace the affected component or the entire distributor. At the same time, optimizing operational procedures or making technical improvements can also be considered to prevent similar problems from occurring in the future. .

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.