HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Topic】【Civil Engineering Version 20170522】

2017-05-22View Original

Thread Content

Participation reward: 2 Wealth. Correct reward: 6 wealth. When controlling construction costs, the appropriate method for managing the usage of materials such as cement and wood is ( ).   A. Limited issuance of materials B. Index control C. Task contracting D. Planned material allocation Answer: A
Reply #22017-05-22
When controlling construction costs, the appropriate method for controlling the usage of materials such as cement and wood is (a )
Reply #32017-05-22
When controlling construction costs, the appropriate method for controlling the usage of materials such as cement and wood is (A).   A. Limited material issuance   B. Index control   C. Task contracting   D. Planned material allocation

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.