In a construction project for a cast-in-place reinforced concrete frame structure, when the first floor of the main structure was completed, the actual construction progress was 4 days behind the planned schedule. Through analysis, it was determined that the main reason was inadequate consideration in the preparation of the construction schedule. With the approval of the supervision engineer and the owner’s representative, the construction team decided to delay the schedule target for the main construction phase of the project by 2 days; at the same time, it adjusted the schedule plan and formulated relevant technical and management measures to accelerate the project progress. When the construction of the fifth layer was completed, the actual progress was exactly in line with the original schedule.   For the construction phase of this project, on-site supervision is required for the entire ( ) process.    A. Construction surveying B. Formwork installation C. Rebar binding and installation D. Concrete pouring 【Correct answer】D
Reply #22018-02-26
 D. Concrete pouring   
Reply #32018-02-26
In a construction project for a cast-in-place reinforced concrete frame structure, when the first floor of the main structure was completed, the actual construction progress was 4 days behind the planned schedule. Through analysis, it was determined that the main reason was inadequate consideration in the preparation of the construction schedule. With the approval of the supervision engineer and the owner’s representative, the construction team decided to delay the schedule target for the main construction phase of the project by 2 days; at the same time, it adjusted the schedule plan and formulated relevant technical and management measures to accelerate the project progress. When the construction of the fifth layer was completed, the actual progress was exactly in line with the original schedule.   Given the construction phase of this project, on-site supervision is required for (C) the entire process.    A. Construction surveying   B. Formwork installation   C. Reinforcement binding and installation   D. Concrete pouring   
Reply #42018-02-26
DDDDDDDDDDD

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.