HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

[Utilities – Water Supply and Drainage Section] 20180919

2018-09-19View Original

Thread Content

This post was last edited by hesonchang214 on 2021-4-25 at 17:51. The maximum daily design water demand Qd is the sum of ( ). a. Water for residential use, water for industrial production and for employees’ living needs, water used for watering roads and landscaping, water lost due to pipeline leaks, and unforeseen water usage amounts. b. Comprehensive domestic water use, water for industrial production and for employees’ living needs, water used for watering roads and landscaping, water lost due to pipeline leaks, and unforeseen water usage amounts. c. Water for residential use, water for industrial production, water used for watering roads and landscaping, water for firefighting purposes, water lost due to pipeline leaks, and unforeseen water usage amounts. d. Comprehensive domestic water use, water used for watering roads and landscaping, water for firefighting purposes, water lost due to pipeline leaks, and unforeseen water usage amounts. Answer: b. The maximum daily design water demand Qd represents the highest daily water consumption that the urban water supply system may experience during its design lifespan. In calculating this value, it is necessary to include comprehensive domestic water use (or water use for residential purposes and public buildings), water for industrial production and for employees’ living needs, water used for watering roads and landscaping, water lost due to pipeline leaks, as well as unforeseen water usage amounts. The fire protection water demand is not included in the calculation of the maximum daily design water demand.
Reply #22018-09-19
b. Comprehensive domestic water use, water used for industrial production and staff living needs, water used for watering roads and landscaping, water lost through pipeline leaks, and unforeseen water amounts
Reply #32018-09-19
b. Comprehensive domestic water use, water used for industrial production and staff living needs, water used for watering roads and landscaping, water lost through pipeline leaks, and unforeseen water amounts
Reply #42018-09-19
b. Comprehensive domestic water use, water used for industrial production and staff living needs, water used for watering roads and landscaping, water lost through pipeline leaks, and unforeseen water amounts
Reply #52018-09-19
b. Comprehensive domestic water use, water used for industrial production and staff living needs, water used for watering roads and landscaping, water lost through pipeline leaks, and unforeseen water amounts
Reply #62018-09-19
b. Comprehensive domestic water use, water used for industrial production and staff living needs, water used for watering roads and landscaping, water lost through pipeline leaks, and unforeseen water amounts

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.