HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190126

2019-01-26View Original

Thread Content

In the water supply system, ( ) is calculated based on the maximum daily peak flow rate. a. Water treatment structures b. Secondary pumping station c. Secondary pumping station in a water tower-free pipeline network d. Pipeline network Answer: c, d
Reply #22019-01-26
c. Secondary pumping stations in the water tower pipeline system
Reply #32019-01-26
c. Secondary pumping stations in the water tower pipeline network d. Pipeline network
Reply #42019-01-26
c. Secondary pumping stations in the water tower pipeline system
Reply #52019-01-26
c. Secondary pumping stations in the water tower pipeline network d. Pipeline network

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.