HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Water Supply and Drainage - 20190617

2019-06-17View Original

Thread Content

This post was last edited by hesonchang214 on 2019-7-10 at 17:09. A pair of water towers should be installed in the water distribution network, and the water pressure control point should be determined at ( ) during peak water usage. A. At the boundary line of the water supply network B. At the highest level of the water tower or cistern C. At the location where a fire occurs in the water-consuming area D. At the location of large consumers in the water-consuming area Answer: C
Reply #22019-06-17
C. Location of the fire in the water use area
Reply #32019-06-17
D. At the location of large water users in the water consumption area

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.