This post was last edited by hesonchang214 on 2019-8-30 22:17. The project duration for projects without a fixed contract period is (  ).   A. The deadline specified by Party A shall apply. B. The actual duration of construction shall apply. C. The fixed time limit serves as the maximum duration allowed. D. The schedule outlined in the construction plan shall apply. 【Answer】C
Reply #22019-08-29
C. The time quota represents a maximum limit on the duration of work

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.