HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Civil Engineering - 20200406

2020-04-06View Original

Thread Content

Which of the following is not a construction method for concrete-filled steel tube columns? ( ) A. Pumping jacking pouring method B. Vertical climbing pouring method C. Vertical manual pouring method D. Vertical high-altitude dropping vibration-free method Answer: C
Reply #22020-04-06
The following is not a construction method for concrete-filled steel tube columns: (C. Vertical manual pouring method).

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.