HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Daily Question】Utilities - Mechanical & Electrical - 20200617

2020-06-17View Original

Thread Content

This post was last edited by hesonchang214 on 2020-6-17 09:04. The construction of industrial furnace structures shall only proceed after the boiler foundation, the furnace’s steel framework, and the main boiler equipment have been installed and inspected successfully, and after the relevant agreements have been signed. A. Process handover certificate B. Certificate of successful installation of the boiler’s main components C. Certificate of successful pressure testing of the boiler D. Process handover document signed by the supervision engineer Answer: A
Reply #22020-06-17
D. Procedure handover documents signed by the supervision engineer

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.