Thread Content
Recently, the PUSRI-IIIB project in Palembang, Indonesia, after two months of meticulous preparation, carried out the pouring of the foundation for its largest structure to date – the granulation tower. This pouring marks a new critical phase in the project’s construction. To ensure the successful completion of the pouring task, the project team held several specialized meetings with the client to repeatedly discuss and optimize the pouring plan. At the same time, multiple concrete mixing plants were visited in detail to thoroughly examine the supply of raw materials and the quality of production, thereby ensuring the stability and reliability of concrete supply. During the construction process, project leaders and key technical personnel remained on site throughout to provide on-site supervision. With close coordination and cooperation among various departments, they overcame numerous challenges such as differences in construction standards (national vs. American standards), limited and muddy site conditions, long distances for concrete transportation, and a shortage of construction vehicles, thereby ensuring the high-quality progress of the pouring work.
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2543 to 2025, Yizheng Chemical Fiber successfully introduced TM365, a TPEE (thermoplastic polyester) elastomer used for creating pore-free, waterproof, and breathable membranes. https://bbs.hcbbs.com/thread-5696986-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】Significant breakthroughs have been achieved in the field of biomass gasification between 2024 and 2025; Shanghai Electric has introduced the world’s first pure-oxygen pressurized biomass fluidized-bed gasification technology. https://bbs.hcbbs.com/thread-5696995-1-1.html (Source: Haichuan Chemical Industry Forum)
【Haichuan Teahouse】The three-colored pillar at the entrance of the Yangzi Petrochemical Plant https://bbs.hcbbs.com/thread-5697064-1-1.html (Source: Haichuan Chemical Forum)
【Frontiers in HaiChuan Chemical Technology】Dalian Institute of Chemical Physics develops a electrochemical dual-mode green propellant; it was used on the Tianzhou-9 cargo spacecraft to achieve in-orbit operation https://bbs.hcbbs.com/thread-5697090-1-1.html (Source: HaiChuan Chemical Forum)
【Haichuan Teahouse】Gansu Province cuisine----Stewed Dishes https://bbs.hcbbs.com/thread-5697091-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】2548-2025: CNOOC Engineering’s cryogenic liquid hydrogen storage tanks have obtained the AIP certificate from China Classification Society https://bbs.hcbbs.com/thread-5697254-1-1.html (Source: Haichuan Chemical Engineering Forum)
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2555 to 2025: Chongqing successfully developed and delivered China’s first methanol injection valve https://bbs.hcbbs.com/thread-5697354-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】New generation of high-performance non-fluorine porous ion-conducting membranes developed successfully 2557–2025 https://bbs.hcbbs.com/thread-5697362-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2058 to 2025, Shangyu, Zhejiang will build China’s first highly automated flexible/mass-production line capable of producing semiconductor KrF photoresist resins in quantities of 100 tons each. https://bbs.hcbbs.com/thread-5697374-1-1.html (Source: Haichuan Chemical Industry Forum)
【Ten Years of Rapid Development in Chemical Equipment】2561-2025: Successful pilot production of high-purity aramid raw material para-phenylenediamine by Jiangxi Fangyuan New Materials https://bbs.hcbbs.com/thread-5697403-1-1.html (Source: Haichuan Chemical Industry Forum)