The 200-ton amination reactor, the key equipment for Yongrong Technology’s adipic acid project, was successfully lifted in one go

2025-11-15View Original

Thread Content

According to news from November 11, 2025, the ammonolysis reactor, a key piece of equipment in Yongrong Technology’s adipic acid project and weighing nearly 200 tons per unit, was successfully lifted in one go, marking the official entry of the project construction into the final stage of equipment installation. As the core equipment for the adipic acid project, the ammonolysis reactor is the largest and heaviest core patented equipment among the process packages in this project. To ensure the smooth transportation and installation of the ammonolysis reactor, the adipic acid department coordinated with the contractor, the manufacturer, and other relevant parties to hold multiple discussion meetings. A detailed construction plan was developed in advance, and the transportation and installation were carried out through separate manufacturing followed by on-site assembly. This approach successfully overcame challenges such as the difficulty in transporting large equipment, high transportation costs, and slow lifting processes, enabling the equipment to be lifted successfully in one attempt and laying a solid foundation for its subsequent smooth installation. Liu Yong, the deputy director in charge of hexamethylenediamine, said that currently, the arrival rate of project equipment has reached 85%, while the installation completion rate has exceeded 41%; the overall construction of the project has entered a critical phase of accelerated progress. Next, the adipic acid department will actively respond to the call for the campaign to capture Shenyang in the Liaoshen Campaign, earnestly implement the \"Performance Director 10\" philosophy, adhere to the project construction principle of \"ensuring safety through quality and accelerating progress through safety\", and push forward project construction with high standards and strict requirements, striving to complete and put the project into operation at an early date.
Reply #22025-11-16
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2018 to 2025, Donghua Company’s graphene-based anti-corrosion coatings produced via gas-phase synthesis were included in the list of innovations recommended by central state-owned enterprises. https://bbs.hcbbs.com/thread-5705057-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-11-17
【Ten Years of Rapid Development in Chemical Equipment】2823-2025: Zhejiang Xinhecheng becomes the third company in the world to master the technology for producing bio-based PPS products. https://bbs.hcbbs.com/thread-5705209-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-11-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s largest \"carbon capture\" project: Successful trial injection of carbon dioxide in Yulin’s 4 million-ton capacity \"carbon capture\" project 28262025 https://bbs.hcbbs.com/thread-5705257-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-11-17
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2027 to 2025, the Wulanchabu \"integration of power generation, transmission, consumption, and storage\" test base operated by China Three Gorges Corporation successfully produced liquid hydrogen. https://bbs.hcbbs.com/thread-5705274-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #62025-11-18
【Ten Years of Rapid Development in Chemical Processing Equipment】Delivery of the first modular submerged combustion vaporizer (SCV) unit in China that utilizes a floating storage and regasification unit (FSRU), 2828–2025 https://bbs.hcbbs.com/thread-5705393-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-11-18
【Ten Years of Rapid Development in Chemical Engineering Equipment】China-made seawater desalination modules for European methanol projects were officially delivered and shipped, 2829–2025 https://bbs.hcbbs.com/thread-5705395-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.