HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The 100MW solar thermal project in Bortala Prefecture, Xinjiang is advancing at pace with commissioning scheduled as planned

2025-12-10View Original

Thread Content

The 100MW solar thermal project in Bortala Prefecture, Xinjiang, is advancing at pace with its commissioning scheduled for as planned. At the end of the cold winter, cold waves sweep across the northwest, prompting construction projects to enter the winter construction phase. The construction site of the 100,000-kilowatt solar thermal power project of Xinhua Hydropower Co., Ltd. in Bortala Prefecture, Xinjiang, which is being built by Gansu Installation and Construction Group Co., Ltd. (abbreviated as Gansu Installation), presents a scene entirely different from that of the harsh winter – with continuous enthusiasm and accelerated progress. The builders are going all out in this final phase of the year to speed up the project’s completion so that clean energy can be generated as soon as possible. https://p3-sign.toutiaoimg.com/tos-cn-i-axegupay5k/ed1dac61f26f425582e609a55e487ac4~tplv-tt-origin-web:gif.jpeg?_iz=58558&from=article.pc_detail&lk3s=953192f4&x-expires=1765948389&x-signature=Jw8uVg%2B4orjKkLwtchb1dJkJ8kY%3D To ensure that project quality is under control and safety is maintained, the project team promptly developed relevant plans, and made comprehensive arrangements for the technical requirements, insulation measures, and safety protocols related to winter construction of key processes such as pipeline welding. In accordance with the winter construction plan, specialized training on winter construction safety is carried out in depth, and safety briefings are given regarding the \"five prevention\" measures of anti-slip, anti-freezing, fire prevention, electric shock prevention, and poisoning prevention, to ensure safe operations at the site. At the same time, strengthen on-site safety inspections by conducting daily checks on temporary electrical installations, scaffolding, lifting equipment, etc. at the construction site, in order to eliminate potential safety hazards promptly.
Reply #22025-12-11
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #32025-12-11
【Ten Years of Rapid Development in Chemical Equipment】From 2887 to 2025: The world’s first 50,000 tons/year facility for producing anhydrous ethanol through synthetic gas biofermentation successfully generated high-quality anhydrous ethanol and biological proteins. https://bbs.hcbbs.com/thread-5707547-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #52025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #62025-12-12
【Ten Years of Rapid Development in Chemical Equipment】The “second-generation high-efficiency, low-energy urea synthesis process technology” with fully independent intellectual property rights, ranging from 2890 to 2025, has reached an internationally leading level in terms of overall technical performance. https://bbs.hcbbs.com/thread-5707669-1-1.html (Source: Hainan Chemical Industry Forum (HCBBS))
Reply #72025-12-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #82025-12-12
【Ten Years of Rapid Development in Chemical Engineering Equipment】2892–2025: The world’s first 630°C secondary reheating thermal power project – The bypass system for the 2×1000MW ultra-supercritical secondary reheating steam turbines at Datang Yuncheng. Link: 289 https://bbs.hcbbs.com/thread-5707850-1-1.html (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #92025-12-13
【Ten Years of Rapid Development in Chemical Processing Equipment】For the first time in China, a full-scale venting test for 10-megapascal high-pressure hydrogen pipelines was successfully carried out from 2023 to 2025. https://bbs.hcbbs.com/thread-5707979-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #102025-12-13
【Ten Years of Rapid Development in Chemical Equipment】2894-2025: SINOPEC CRIC Builds the World’s Largest and Heaviest EO Reactor https://bbs.hcbbs.com/thread-5708001-1-1.html (Source: Haichuan Chemical Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.