【Daily Question No. 244】September 7, 2018: The blind plate should be installed at the flange of the valve ( ) from which the material flows in. Gaskets should be placed on both sides of the blind plate, and the bolts should be tightened to ensure a tight seal. A. Front side B. Back side. B. Back side. Correct 3, Incorrect 1; Mass posting of posts – rated based on the lowest score ; Replies that are unrelated to the answer are considered spam and will be deleted immediately. For management purposes, if you need to view content from a few days ago, please go to https://bbs.hcbbs.com/home.php?mod=space&uid=3862647&do=thread&view=me&from=space through the summary post below
Reply #22018-09-07
This post was last edited by drift by_WEWJ on 2018-9-7 09:27 under B. Back part
Reply #32018-09-07
The blind flange should be installed at the flange of valve (B) from where the material flows in; gaskets should be placed on both sides of the blind flange, and the bolts should be tightened to ensure a tight seal. A. Front B. Back.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.