Total investment of 13.95 billion! Latest updates on the relocation, upgrading, and transformation project of the caprolactam industry chain at Baling Petrochemical!

2022-01-05View Original

Thread Content

At 6:30 on January 1st, the first round-trip vehicle for the construction site was officially dispatched by the Project Department responsible for the relocation, upgrading, and transformation of Baling Petrochemical’s caprolactam production chain. This shuttle route is a 5.4-kilometer circular main road surrounding the project site, with 12 stops along the way. Two buses capable of carrying 54 passengers each depart from the east and south sides of the site respectively, traveling in opposite directions around the site. The service operates from 6:30 am to 7:00 pm daily, and all project personnel can ride for free upon presentation of valid work identification. The Baling Petrochemical Caprolactam industry chain relocation, upgrading, and transformation project is a key construction project for both Sinopec and Hunan Province. With a total investment of 13.95 billion yuan, it covers an area of 2,651 mu, equivalent to the size of 238 football fields, and its enclosed perimeter measures 5.4 kilometers in length. To address traffic issues on the site, the company has implemented an optimized solution by introducing shuttle buses for the construction area and designing convenient and efficient traffic routes to help improve the efficiency of construction work. “In the past, when we went to the construction site, we had to walk there, which was time-consuming and laborious; sometimes, routine inspections would take up most of the day. Now that there are site shuttles, travel time is reduced, which not only makes things more convenient and fast but also improves work efficiency. ”said Wu Chonghua, a technician from the construction department of the project. “It’s cold outside now, but we can take the free site shuttle to reach the construction site quickly, which makes us feel warm inside. ”Hui Junbian, a welder from Sinopec’s Fifth Construction Company, who is in charge of this project, said that as he spoke he got on the shuttle bus with his colleague Song Lu to head to the construction site at the power station. Currently, 2,864 tons of the boiler’s steel structure have been installed for this project, representing a completion rate of 46.37% ; 882 tons of air preheaters have been installed, with a completion rate of 43.88% ; 210 tons of water wall have been installed, with a completion rate of 27.52% ; 113 tons of economizers have been installed, with a completion rate of 7.59% ; 48 tons of superheaters have been installed, with a completion rate of 5.35%. Since the launch of the Party history study and education campaign, Baling Petrochemical has addressed various challenges and obstacles, actively carrying out practical initiatives aimed at delivering benefits to the people. It has translated the outcomes of this Party history study and education into high-quality progress in project development. By going deep among the grassroots and the general public, it has gained a genuine understanding of the thoughts, desires, and needs of its employees and construction teams, thereby continuously improving the conditions and environment for construction work and ensuring that real benefits are delivered to those who work there.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.