HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In what situations is 100% UT testing required for composite plate pressurized heads?

2018-11-27View Original

Thread Content

Under what circumstances is it required that composite head covers manufactured by full-plate pressing undergo 100% UT testing after pressing is completed? Is there any regulation specifying this?
Reply #22018-11-27
Head covers made of titanium and nickel composite sheets must undergo 100% UT testing after molding.
Reply #32018-11-27
Thank you. I’ve learned about it. In our case, it’s 15CrMoR+S32168, with a δ value of 24+3. The plate is quite thick, and I’m considering whether to request 100% UT testing
Reply #42018-11-27
No regulations were found regarding whether ultrasonic testing is required again after the forming of stainless steel composite plate heads. It is possible to decide whether to add inspection requirements based on the importance of the equipment.
Reply #52018-11-28
Looking at the material, there shouldn’t be such a requirement in the standards. However, it’s definitely better to do it in order to check the adhesion of the composite layer

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.